Coverage calculator
Road Base Calculator: How Much Class II Base Do I Need?
Calculate the compacted volume, then add for compaction. Area times compacted depth in inches, divided by 324, gives finished cubic yards; add roughly twenty-five percent for the loose volume you need to place. A 600 square foot pad at four inches compacted is 7.4 finished yards, so order about 9.
Delivery is not auto-priced. One load of any material up to 20 cubic yards, hauled in one trip on our own truck-and-transfer rigs, quoted by city and truck access.
Calculate your road base order
Enter your measurements and the calculator opens on road baseat today’s listed price. It applies a ten percent buffer, because ground is never perfectly level.
Estimate material quantity
Use clean measurements to estimate yards or tons. Delivery is intentionally left out so you can send the real job details for a custom quote.
Area shape
Natural material coverage changes by rock size, compaction, moisture, slope, edging, and install depth. The 10% buffer helps reduce short loads, but final ordering should be confirmed before delivery.
Estimate summary
Material subtotal before delivery
Square feet
200 sq ft
Cubic yards
1.36 yd with buffer
Recommended order
1.5 Yard
Material subtotal
$59
Delivery is not included here. It should be quoted by Victor based on city, distance, truck access, order size, split-load needs, and the requested schedule.
Add delivery details
These fields are added to the message or email so the delivery quote can be built manually with the right site details.
Coverage reference
How far one yard of road base goes
A cubic yard is 27 cubic feet, so one yard spread an inch deep covers 324 square feet. At 4 inches, the depth road base is most often laid at, it covers 81 square feet.
| Depth | One yard covers | What this depth is for |
|---|---|---|
| 4" | 81 sq ft | Common under a residential walkway or patio |
| 6" | 54 sq ft | Driveways and areas carrying light vehicles |
| 8" | 41 sq ft | Heavier vehicle loading, subject to the specification |
| 12" | 27 sq ft | Deep sections and poor subgrade, per engineering |
Yards of road base by area and depth
Find your square footage down the left and your depth across the top. Order the next whole yard up, and add about ten percent for settling and uneven ground.
| Area | 4" deep | 6" deep | 8" deep | 12" deep |
|---|---|---|---|---|
| 200 sq ft | 2.5 yd | 3.7 yd | 4.9 yd | 7.4 yd |
| 400 sq ft | 4.9 yd | 7.4 yd | 9.9 yd | 14.8 yd |
| 600 sq ft | 7.4 yd | 11.1 yd | 14.8 yd | 22.2 yd |
| 1,000 sq ft | 12.3 yd | 18.5 yd | 24.7 yd | 37 yd |
| 1,500 sq ft | 18.5 yd | 27.8 yd | 37 yd | 55.6 yd |
| 2,500 sq ft | 30.9 yd | 46.3 yd | 61.7 yd | 92.6 yd |
| 4,000 sq ft | 49.4 yd | 74.1 yd | 98.8 yd | 148.1 yd |
These are planning figures for road base. Rock size, compaction, moisture, slope and edging all change practical coverage, so confirm the quantity with us before scheduling delivery.
What changes the number for road base
On the ground
Road base is specified by compacted depth, which makes it the material where the calculation and the order differ most. It also has to be placed in lifts and compacted in stages rather than dumped to full depth in one pass, and the required depth comes from the job specification and the subgrade, not from a coverage table. At roughly 1.25 tons per cubic yard it is heavy: a twenty yard load is around twenty-five tons, which is a truck-and-transfer load rather than a single dump truck.
Depth we would recommend
Take the depth from the specification. As a rough orientation, four inches compacted is common under a residential walkway or patio, and six to eight inches under a driveway or anything carrying vehicles. Send us the spec and we will confirm sourcing, because CMB and number 57 aggregate are specification terms rather than automatic substitutes for Class II base.
Road base options and current prices
The calculator prices whichever of these you pick. The listed Class 2 Road Base is the starting catalog option. CMB means crushed miscellaneous base; CMB and #57 aggregate are specification terms, not automatic substitutes for Class II base. Send the job specification to confirm sourcing and availability. For tons vs yards, request a material-specific conversion and include the required compacted depth. Next-day job-site delivery depends on stock, trucks, and access.
Road base quantity questions
How much does a yard of road base weigh?
About 1.25 tons loose. That matters for access more than for price: twenty yards is roughly twenty-five tons, so the truck needs room to get in and a clear place to dump.
How much extra road base should I order for compaction?
Around twenty-five percent over the compacted volume. Base is specified compacted, so the loose yardage you place is always more than the finished depth implies.
Is CMB the same as Class II road base?
Not automatically. CMB is crushed miscellaneous base, and it and number 57 aggregate are specification terms with their own requirements. If your plans call for one specifically, send the specification and we will confirm what we can source rather than substituting.
Fast quote
Message your material, quantity, and delivery address.
The fastest quote includes the material name, estimated square footage or yards, delivery city, dump location, discount eligibility, and a photo if access is tight. Help is as easy as a message away.