
Gold DG
Yard$81 / Yard
With stabilizer: $126 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Decomposed granite delivery in Temescal Valley: Decomposed granite, including gold DG and stabilized DG options, for prepared garden paths and low-water landscape designs. Gated-community projects need an access plan before the load is scheduled. For an HOA landscape refresh, settle the material color and placement area first, then send the approved work scope with your measurements. Connect landscape areas with a planned DG path.
From $78 / Yard
Delivery quoted separately. Ask about next-day or same-day availability, split loads with no split-load surcharge, and military, teacher, or senior discounts.

$81 / Yard
With stabilizer: $126 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$78 / Yard
With stabilizer: $123 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$113 / Yard
With stabilizer: $158 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$85 / Yard
With stabilizer: $130 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$85 / Yard
With stabilizer: $130 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Temescal Valley Water District provides local water, wastewater, and recycled-water resources. Match the project address to the provider on the bill before selecting a turf-conversion resource. For a gated-community refresh, send the approved material palette, visitor-entry instructions, and a photo of the route from the gate to the drop area.
Connect landscape areas with a planned DG path.
Temescal Valley Water DistrictStandard DG and stabilized DG have different installation requirements. Gold DG and other listed colors offer a separately priced stabilizer option. Confirm preparation, compaction, slope, and drainage with your installer before deciding on the finish.
One cubic yard covers 162 square feet at 2 inches before compaction and allowances. Calculate your volume; ask for a material-specific weight conversion for products sold by the ton.
Gold DG — With stabilizer: $126 / Yard
Brown DG — With stabilizer: $123 / Yard
Red DG — With stabilizer: $158 / Yard
Palm Springs Gold DG — With stabilizer: $130 / Yard
Grey DG — With stabilizer: $130 / Yard
Yes. Text a gate photo, visitor entry instructions, and the full truck path to the unload spot. We confirm material availability, truck access, and the delivery charge before scheduling.
Listed material starts at $78 / Yard. Delivery is quoted separately for your address, access, and load size. Standard DG and stabilized DG have different installation requirements. Gold DG and other listed colors offer a separately priced stabilizer option. Confirm preparation, compaction, slope, and drainage with your installer before deciding on the finish.
Request your preferred date with the quote. Next-day or same-day delivery may be available depending on stock, trucks, and confirmed access. Split loads have no split-load surcharge; material and delivery charges still apply.
Fast quote
The fastest quote includes the material name, estimated square footage or yards, delivery city, dump location, discount eligibility, and a photo if access is tight. Help is as easy as a message away.