
Gold DG
Yard$81 / Yard
With stabilizer: $126 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Decomposed granite delivery in Upland: Decomposed granite, including gold DG and stabilized DG options, for prepared garden paths and low-water landscape designs. Refreshing an older landscape starts with checking the depth of the existing cover. Dig a few small inspection spots, identify bare sections, and measure the areas that need replenishing rather than assuming the whole yard needs replacement. Renew a defined garden walkway.
From $78 / Yard
Delivery quoted separately. Ask about next-day or same-day availability, split loads with no split-load surcharge, and military, teacher, or senior discounts.

$81 / Yard
With stabilizer: $126 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$78 / Yard
With stabilizer: $123 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$113 / Yard
With stabilizer: $158 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$85 / Yard
With stabilizer: $130 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.

$85 / Yard
With stabilizer: $130 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
IEUA lists both the City of Upland and San Antonio Water Company among local retail water agencies. Use the provider on the property’s water bill when checking landscape-conversion resources. For an existing rock bed, inspect the remaining depth at several spots and quote replenishment only for the areas that need it.
Renew a defined garden walkway.
IEUA retail water agenciesStandard DG and stabilized DG have different installation requirements. Gold DG and other listed colors offer a separately priced stabilizer option. Confirm preparation, compaction, slope, and drainage with your installer before deciding on the finish.
One cubic yard covers 162 square feet at 2 inches before compaction and allowances. Calculate your volume; ask for a material-specific weight conversion for products sold by the ton.
Gold DG — With stabilizer: $126 / Yard
Brown DG — With stabilizer: $123 / Yard
Red DG — With stabilizer: $158 / Yard
Palm Springs Gold DG — With stabilizer: $130 / Yard
Grey DG — With stabilizer: $130 / Yard
Yes. Show tree canopy clearance and the driveway entrance from the street. We confirm material availability, truck access, and the delivery charge before scheduling.
Listed material starts at $78 / Yard. Delivery is quoted separately for your address, access, and load size. Standard DG and stabilized DG have different installation requirements. Gold DG and other listed colors offer a separately priced stabilizer option. Confirm preparation, compaction, slope, and drainage with your installer before deciding on the finish.
Request your preferred date with the quote. Next-day or same-day delivery may be available depending on stock, trucks, and confirmed access. Split loads have no split-load surcharge; material and delivery charges still apply.
Fast quote
The fastest quote includes the material name, estimated square footage or yards, delivery city, dump location, discount eligibility, and a photo if access is tight. Help is as easy as a message away.