
Class 2 Road Base
Yard$42 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Road base delivery in Murrieta: Construction gravel and Class II base for projects that specify a compacted base layer, with job-site dump placement planned before delivery. A front-yard conversion works best when paths, plant pockets, and decorative cover are measured as separate areas. Choose the rock color with the existing hardscape in view before ordering enough for the whole project. Lay out a compacted path between retained plants.
From $42 / Yard
Delivery quoted separately. Ask about next-day or same-day availability, split loads with no split-load surcharge, and military, teacher, or senior discounts.

$42 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
EMWD’s drinking-water service description includes parts of Murrieta, including Murrieta Hot Springs and French Valley. Check your own water bill before choosing the agency for a turf-conversion inquiry. For a bed-and-path project, subtract retained plant pockets from the gravel area and calculate compacted DG separately from loose cover.
Lay out a compacted path between retained plants.
EMWD drinking-water service areasThe listed Class 2 Road Base is the starting catalog option. CMB means crushed miscellaneous base; CMB and #57 aggregate are specification terms, not automatic substitutes for Class II base. Send the job specification to confirm sourcing and availability. For tons vs yards, request a material-specific conversion and include the required compacted depth. Next-day job-site delivery depends on stock, trucks, and access.
One cubic yard covers 162 square feet at 2 inches before compaction and allowances. Calculate your volume; ask for a material-specific weight conversion for products sold by the ton.
Yes. Identify the driveway slope and send a photo that includes both the street and the unload area. We confirm material availability, truck access, and the delivery charge before scheduling.
Listed material starts at $42 / Yard. Delivery is quoted separately for your address, access, and load size. Send the specified aggregate and compacted depth; Class II base, CMB, and #57 are not interchangeable specifications.
Request your preferred date with the quote. Next-day or same-day delivery may be available depending on stock, trucks, and confirmed access. Split loads have no split-load surcharge; material and delivery charges still apply.
Fast quote
The fastest quote includes the material name, estimated square footage or yards, delivery city, dump location, discount eligibility, and a photo if access is tight. Help is as easy as a message away.