
Class 2 Road Base
Yard$42 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Road base delivery in Wildomar: Construction gravel and Class II base for projects that specify a compacted base layer, with job-site dump placement planned before delivery. When replacing scattered rock or patchy mulch, identify which sections can be topped up and which need a complete reset. Sending a photo of the existing material helps narrow the size and color before the quote. Replace an informal garden track with a defined path.
From $42 / Yard
Delivery quoted separately. Ask about next-day or same-day availability, split loads with no split-load surcharge, and military, teacher, or senior discounts.

$42 / Yard
A practical base or pathway material for hardscape prep, paver areas, DG paths, grading, and construction support around outdoor projects.
Wildomar is included in EVMWD’s service-area planning alongside neighboring Elsinore Valley communities. When refreshing an existing bed, send a close-up of the old rock and a wider photo of the area so size matching and truck placement can be discussed separately. Quote a top-up only after measuring the depth that remains.
Replace an informal garden track with a defined path.
EVMWD service-area planningThe listed Class 2 Road Base is the starting catalog option. CMB means crushed miscellaneous base; CMB and #57 aggregate are specification terms, not automatic substitutes for Class II base. Send the job specification to confirm sourcing and availability. For tons vs yards, request a material-specific conversion and include the required compacted depth. Next-day job-site delivery depends on stock, trucks, and access.
One cubic yard covers 162 square feet at 2 inches before compaction and allowances. Calculate your volume; ask for a material-specific weight conversion for products sold by the ton.
Yes. Describe the entrance surface and note any narrow passage between the road and the preferred pile. We confirm material availability, truck access, and the delivery charge before scheduling.
Listed material starts at $42 / Yard. Delivery is quoted separately for your address, access, and load size. Send the specified aggregate and compacted depth; Class II base, CMB, and #57 are not interchangeable specifications.
Request your preferred date with the quote. Next-day or same-day delivery may be available depending on stock, trucks, and confirmed access. Split loads have no split-load surcharge; material and delivery charges still apply.
Fast quote
The fastest quote includes the material name, estimated square footage or yards, delivery city, dump location, discount eligibility, and a photo if access is tight. Help is as easy as a message away.